I’m hoping to have it completed this week.  Almost all of the cuts have been completed.  A lot of finishing needs to be done.  Also, some fitting, drilling and tapping.  I have a trip to the north east which I’m likely to have to make before I can get the cane anodized.  A week or so shouldn’t hurt it!